International Projects

ENCON INTERNATIONAL PROJECTS

THAI RAYON - Installation Capacity - TRC 500 x 2

THAI RAYON - Installation Capacity - TRC 500 x 2

Problem:Industries require efficient cooling solutions to manage process water temperatures effectively. Traditional cooling systems may face performance limitations, leading to higher energy consumption, inefficient heat transfer, and increased water usage, impacting overall operational

Read More
PT INDO BHARAT RAYON - Installation Capacity (450 CMH)

PT INDO BHARAT RAYON - Installation Capacity (450 CMH)

Problem: Industries require efficient cooling solutions to manage high water temperatures. Traditional cooling systems may struggle with heat dissipation, leading to inefficiencies, increased water consumption, and performance issues in industrial operations.Solution:Encon Group has in

Read More
THAI RAYON - Installation Capacity - TRC 450 CMH X 15 CELLS

THAI RAYON - Installation Capacity - TRC 450 CMH X 15 CELLS

Problem:The existing bottle-type cooling tower was inefficient in handling heat transfer and water usage, leading to suboptimal cooling performance. This inefficiency could result in higher operational costs, increased water consumption, and reduced sustainability in industrial application

Read More
Encon’s Innovative Carbon Fibre Fan Blades - Upgrade for a successful performance at a Global Refinery Client in Turkey

Encon’s Innovative Carbon Fibre Fan Blades - Upgrade for a successful performance at a Global Refinery Client in Turkey

Encon’s Innovative Carbon Fibre Fan Blades - Upgrade for a successful performance at a Global Refinery Client in Turkey ENCON’s Commitment to Innovation and EfficiencyAt ENCON, we take pride in delivering innovative solutions that drive energy efficiency and operational excellence for

Read More
SUPPLY OF COUNTER FLOW FRP PULTRUDED COOLING TOWER

SUPPLY OF COUNTER FLOW FRP PULTRUDED COOLING TOWER

Read More
Our Successful Overseas Installed Cooling Tower in Thailand

Our Successful Overseas Installed Cooling Tower in Thailand

ASSIGNMENT  Supply & Conversion of Bottle Type Counter Flow to Pultruded FRP IDCT of 450 m3/hr ( 1 Cell) (1487 TR) PARAMETERS DESIGN VALUES Capacity 450 m3/hr HOT WATER TEMPERATURE 41 Â

Read More
Establishing business in South Korea during challenging phase of Worldwide Lockdown

Establishing business in South Korea during challenging phase of Worldwide Lockdown

PROJECT  Supply, Installation and testing of Encon’s first Cooling Tower Fan assembly in South Korea. CHALLENGE  The year 2020 has been a challenging year marked by historical events and unforeseen changes to work lives. When the entire world was dealing wit

Read More